From raw material to sea-ready SUP —every step under our control

Unlike brands that outsource production to third-party factories, afarer owns and operates its entire manufacturing chain. This vertical integration allows us to maintain strict quality control at every stage, respond quickly to custom requirements, and deliver consistent product quality batch after batch. Here is how a SUP board is built in our facility.

01

Material Receipt & Inspection

1–2 days

Every incoming batch of PVC fabric, fiberglass mat, resin, and hardware is inspected against specification. Fabric samples are tested for tensile strength, thickness uniformity, and UV resistance before release to production. Non-conforming materials are quarantined and returned.

02

Automatic PVC Cutting

2–4 hours per boat kit

Approved fabrics are laid on the automatic CNC cutting machine and cut with sub-millimetre accuracy. Computer-optimised nesting arranges panels to minimise waste —typically below 5%. Cut panels are labelled by boat model and chamber, then bundled for transfer to the welding workshop.

03

Tube Heat Sealing & Welding

1–2 days per boat

Panels are tacked and bonded using heat sealing machines with hot-air welding at controlled temperatures of 200–300 °C. Main seams are reinforced with RF dielectric welding for airtight, high-strength joints. Completed chambers are inflated to 1.5× working pressure for 30-minute air-retention validation.

04

Drop-Stitch Core Bonding

1–2 days per board

SUP board drop-stitch cores are bonded to outer PVC laminates using heat lamination. Thousands of internal polyester threads connect top and bottom layers, creating a rigid structure at 12-15 PSI. Rail bands are triple-layer fusion bonded for edge strength.

05

SUP Printing & Decoration

1–2 days

SUP board deck graphics are applied using digital printing for full-colour photo-quality designs, and screen printing for durable logos and repeating patterns. Prints are cured and sealed for UV and abrasion resistance.

06

Final Assembly & Fitting

1–2 days

Valves, D-rings, handles, fin boxes, and deck pads are installed on the assembly line. Each board follows a 100-point assembly checklist with mandatory sign-off at each stage.

07

Quality Testing & Inspection

1–2 days

Every completed board undergoes mandatory quality gate: chamber air-retention test, hardware function check, fastener torque verification, and cosmetic inspection. Custom and prototype builds also receive in-water trials covering stability and handling.

08

Packing & Shipping

1 day

Boards are deflated, folded per procedure, packed in heavy-duty woven bags or retail boxes, and loaded for shipment. Each package is labelled with model, serial number, and destination. We coordinate with freight forwarders for FCL and LCL container shipments worldwide.